![Parking[1].jpg (22596 bytes)](../images/Parking1_small.jpg)
April 10, 2000. The caravan arrives in Fridley, MN, and begins gathering wood for the Vilma B. It's still snowing! see log entry for this date |

Unloading salvaged wood at the boatramp in the Anoka Riverside Park in Fridley. |
![ramp[1].jpg (53690 bytes)](../images/ramp1_small.jpg)
Unloading salvaged flotation foam, with which we will fill each pontoon. This is what makes it a raft, not a boat. |
![bpontoon[1].jpg (54963 bytes)](../images/bpontoon1_small.jpg)
We put together the first pontoon, while being filmed by NBC news. see log entry for this date |
![hammer[1].jpg (41083 bytes)](../images/hammer1_small.jpg)
June wields the small sledge hammer, driving in nails on the bottom of the first pontoon. |
![team[1].jpg (33872 bytes)](../images/team1_small.jpg)
April 12. Ed, Aurelia, Poppa, and June next to the first completed pontoon, just before launching it. |
![pontoon[1].jpg (42368 bytes)](../images/pontoon1_small.jpg)
April 13. Two pontoons are in the water now. see log entry for April 14 |
![plank[1].jpg (51828 bytes)](../images/plank1_small.jpg)
Poppa surveys the work: the two pontoons have been joined, creating the first, 16' section of the raft. |
![move[1].jpg (27124 bytes)](../images/move1_small.jpg)
April 14th, we do our first test run on the river. A 4HP outboard does the job, upstream and down. |
![ic2[1].jpg (48242 bytes)](../images/ic21_small.jpg)
April 18. The first cabin goes on, and Ed moves onboard. see log entry for this date |
![p[1].jpg (41074 bytes)](../images/p1_small.jpg)
Repeating the process, now with the third pontoon. |
![ic[1].jpg (43860 bytes)](../images/ic1_small.jpg)
The third pontoon has been launched and brought alongside; a second cabin has also been built. |
![sign[1].jpg (45381 bytes)](../images/sign1_small.jpg)
Poppa paints the website address on the side of the cabin. |

Getting ready to get underway at last; there are four cabins now - one for Thor and storage space, and one for a galley. |
MORE |